Plan it. Build it.
Control it.

Drawings, specifications, programme, RFIs and submittals that read themselves. A drawing issue lands, its title blocks are read, revisions supersede, the CAD is measured, and the clauses link.

Construction AI·Larkspur House › Drawings
Drawings
Larkspur House · 473 sheets · 12 issues · last received today
Construction AIRead vectorsQR packsUpload
Issue 12 · Stage 4 revision · 6 files from Laird Studio · received from the transmittalreading title blocks…
NumberTitleRevDisciplineStatus
LH-LRD-ZZ-00-DR-A-2000General arrangement — Level 00P6CADArchitectureReading…Processedsupersedes P5
LH-LRD-ZZ-01-DR-A-2001General arrangement — Level 01P6CADArchitectureReading…Processedsupersedes P5
LH-LRD-ZZ-01-DR-A-2301Reflected ceiling plan — Level 01P4ArchitectureReading…Processed
LH-BME-ZZ-01-DR-M-5101Mechanical services — Level 01P3MechanicalReading…Processed
LH-BME-ZZ-01-DR-E-6101Small power and data — Level 01P3ElectricalReading…Processed
LH-LRD-ZZ-XX-DR-A-4010Section A-A through the atriumP2ArchitectureReading…Processed
6 read from the title block and the PDF text2 revisions superseded2 DWGs paired · geometry read14 section links found

The tools

The drawings above. The rest of the project, below.

Construction AI·Larkspur House › Specifications › NBS K10
Plasterboard dry linings — NBS K10ProcessedVerified
Specification · Rev P02 · 40 pages · From Laird Studio · 8 sections
Construction AI
DownloadOpen in new tabConnectThumbnailsSections
Plasterboard dry linings
NBS K10 — particular specification · Larkspur House · Rev P02 · Laird Studio
Search by meaning
“what fire rating do the corridor partitions need?”
610 Fire-rated systems, p.8 — 60 minutes to corridors and stair enclosures; 30 minutes elsewhere. Cross-ref 310 Partitions, p.4.
Sections · 8 main
110Intentp.1
210Plasterboardp.2
215Fixings and adhesivesp.3
310Partitionsp.4
315Bulkheads and ceiling marginsp.5
320Access panelsp.6
420Jointing and finishingp.7
610Fire-rated systemsp.8
Linked records · RFI #004 · LH-LRD-ZZ-01-DR-A-2301
01

Every clause read once, then answered by meaning

A specification is read on upload: sections detected, confirmed by you, and the text embedded. From then on the platform answers questions from it, and every scope, RFI and takeoff can cite the clause.

  • Sections navigate the PDF; the viewer opens at the clause, not page one.
  • Search by meaning across every specification on the project, not by keyword.
  • Connect links the clause to the RFI, the drawing and the submittal that rely on it.
How specifications power the AI
Construction AI·Larkspur House › Programme
Programme
Project schedule and Gantt chart • 0 tasks
Construction AI
+Week ▾⚠ Critical PathBaselinesExport
WBSTask NameStart%
1PHASE 1: MOBILISATION01 Sep
1.1Possession and set-up01 Sep100%
2PHASE 2: STRIP OUT08 Sep
2.1Strip-out, levels 1–308 Sep0%
3PHASE 3: PLANT DECK15 Sep
3.1Plant deck steelwork15 Sep0%
3.2AHU lifts and installation13 Oct0%
4PHASE 4: FIT-OUT29 Sep
4.1Partitions and ceilings29 Sep0%
4.2Raised access floors27 Oct0%
4.3M&E first and second fix03 Nov0%
4.4Finishes and decorations14 Dec0%
5Commissioning and handover25 Jan0%
6Practical completion01 Mar
Sep 2026
Oct
Nov
Dec
Jan 2027
Feb
W36
W40
W44
W48
W52
W4
W8
PHASE 1: MOBILISATION
Possession and set-up
PHASE 2: STRIP OUT
Strip-out
PHASE 3: PLANT DECK
Plant deck steelwork
AHU lifts and installation
PHASE 4: FIT-OUT
Partitions and ceilings
Raised access floors
M&E first and second fix
Finishes and decorations
Commissioning and handover
02

The programme builds from the brief, then keeps itself honest

The Programme Agent writes the work breakdown, the durations and the dependencies from the project brief, and validates it. From there it is a Gantt you own: revisions, a baseline, delay analysis, critical path.

  • Generate from the brief, validate, then edit like any Gantt: drag, link, indent.
  • Save revisions and hold a baseline; delay analysis compares them.
  • Ask the agent for the critical path, the slipped tasks or a what-if.
How the programme AI works
Construction AI·Larkspur House › RFIs › RFI #004
RFI #004 Responded
Reception feature ceiling — confirm omission before bulkhead is framed
Construction AIReviseExport PDF
Is the reply satisfactory?Close RFICreate revision
Northgate Contracts Ltd
Unit 4, Riverside Works · Manchester
RFI #004
P26001 · Larkspur House · for Ardent Estates
Reception feature ceiling — confirm omission before bulkhead is framed
ToR. Menon (Laird Studio)
FromSam Okafor
Date raised19 Aug 2026
Due date26 Aug 2026
LocationLevel 1 reception, grid C/7
Cost code4000 · Drylining
Cost impactYes · CCI 003
Programme impactYes · on the critical path
DrawingsLH-LRD-ZZ-01-DR-A-2301 rev C
SpecificationK10/315 Bulkheads
Ball withSam Okafor
Copies toAlan Pryor, Ardent Estates
Question from Sam Okafor · 19 Aug 2026, 10:00

A-2301 rev C omits the feature ceiling at reception but the door schedule rev B still carries the ceiling-mounted closers. Please confirm the omission is instructed before we frame the bulkhead on Monday 24 August.

Reply from R. Menon, Laird Studio · 22 Aug 2026, 10:00

Confirmed — the feature ceiling is omitted under AI-023. Proceed with the plasterboard bulkhead to detail A-2104/07. The door schedule will be corrected at rev C.

03

The RFI is the document, not a form that prints one

Raise it from the drawing you are looking at, with the clause and the markup attached. It reads as the receiver will read it, on your letterhead, and the reply lands on the same page.

  • Facts in two columns: cost code from the work package, cost and programme impact, the drawings and the clause.
  • Ball with moves on issue, on reply and on referral; the register shows age and due.
  • Close, or create a revision that asks again with the reply on record. Export as a PDF.
Export for external parties
Construction AI·Larkspur House › Submittals
Submittals
Larkspur House · 18 on the register · 2 awaiting the architect
Construction AI+ New submittal
RefTitleSpecStatusDue
SUB-014Suspended ceiling system — technical data · Halliwell DryliningK40/210Approved21 Aug
SUB-015Fire-rated partition test evidence · Halliwell DryliningK10/610Approved as noted28 Aug
SUB-016AHU-01 and AHU-02 — selection and O&M · Marlow MechanicalT60/320Revise and resubmit04 Sep
SUB-017Carpet tile samples — meeting rooms · Pennine FloorsM50/450Under review11 Sep
SUB-018Ironmongery schedule — final · Norton & BellP21/110Draft18 Sep
SUB-016 · AHU-01 and AHU-02 — selection and O&M
Revise and resubmit
Rev A · from Marlow Mechanical, 26 Aug · reviewed by R. Menon, Laird Studio, 2 Sep · spec T60/320 · programme: plant deck AHU set-down 21 Sep
Reviewer’s comment. Selection shows 4.2 m³/s against the 4.8 m³/s in T60/320 clause 3.4. Resubmit with the fan curve at the design duty and the acoustic data for the roof-level attenuators.
Rev B due 11 Sep · 10 days before set-down Programme riskExport PDF
04

Submittals tracked against the spec and the programme

Each submittal cites the specification clause it answers and the programme task it gates. The reviewer’s comment lands on the document; a resubmission is a revision, not a new record.

  • Approved, approved as noted, revise and resubmit: the status the architect gave, on the register.
  • Due dates measured against the task on the programme, so a late resubmission reads as a programme risk.
  • Every submittal exports as a document on your letterhead.
Site management from here

0

PM Tools

0

Minute Drawing Registration

0

Years of PM Experience

0%

Of the platform, for every user

Questions

How does the AI drawing registration work?
When you upload drawings (PDF, PNG, or JPG), the AI reads the title block and extracts the drawing number, title, revision, discipline, scale, and originator. You review the extracted data, make any corrections, and publish to your register. Fifty drawings can be registered in about five minutes.
Can I track drawing revisions automatically?
Yes. When you upload a new revision, the system detects that a drawing with the same number already exists and creates a supersession record. The previous revision is marked as superseded and the new one becomes current. The full revision history is always accessible.
How does the programme AI work?
Tell the agent your project type and it generates a complete work breakdown structure — hierarchy, dependencies, milestones, cost codes — in one call. Once the programme is live, the agent acts as your planning co-pilot: find delayed tasks, calculate the critical path, run what-if analyses, or check health status. Read-only analysis is available from the main AI chat; write tools are only in the embedded Programme panel.
How do specifications power the AI?
On upload, your specifications are processed by OCR, then chunked, embedded, and stored in your database. Every clause, requirement, and performance standard becomes searchable by meaning — not just keywords. This knowledge layer powers the AI across the platform: scope of works generation, project queries, and drawing analysis all draw on your spec documents.
What happens to a drawing supplied as a DWG?
Attach the DWG to the sheet and the geometry is read server-side: layers become a legend, rooms become named spaces, and measurements come from the vectors rather than a scaled PDF. The PDF stays the picture; the DWG supplies the numbers.
Can I export documents for external parties?
Yes. Drawings can be exported with markup annotations as flattened PDFs. RFIs, correspondence, and submittals export as documents on your letterhead. Drawing registers export to Excel. Everything is designed to be shared with consultants, subcontractors, and the project team.