- Is it an ISO 19650 common data environment?
- It is designed around one: work in progress, shared and published states with access to each enforced in the database, the UK suitability codes, preliminary and contractual revision sequences, a naming standard you set per project, and an audit trail of every state change, decision, view and download. There is no product certification against ISO 19650, for us or for anyone, and we do not claim one.
- Do consultants and subcontractors need their own licence?
- No. Every user is included. You invite a firm to the project as an external party, give its people View or Edit access to Document Control, and they issue and review as that firm. They see the revisions their firm is entitled to see and nothing else.
- Does every project have to use it?
- No. Document Control is switched on project by project. On a project without it, drawings, specifications and models are uploaded directly, as before. On a project with it, those registers take only what has been published through the register, so the two can never disagree.
- Can we keep our own numbering and our own review process?
- Yes. The naming standard, the revision scheme, the code lists for types, disciplines and suitability, and the review workflows are all yours to set, as a company default and per project. A workflow template says what the stages are; each project says who does each stage and how many days they have.
- What happens to a drawing once it is approved?
- A revision given a final status of A or B is published to the whole project and copied into the Drawings register within a few minutes, where the site team, the takeoff tools and the agents already work. A B stays open, with its comments on the sheet, until an A revision supersedes it.
- Can a model be reviewed, or only drawings?
- Both. A PDF opens with the mark-up tools: pins, clouds, arrows, text, a layer per reviewer. An IFC opens in 3D and comments are pinned to the elements they concern. Either way the comments land on the same comment register and carry to the next revision until they are closed.