Control the money

What the job is making, by cost code. Without building the spreadsheet.

Value and cost are reconciled by cost code from the applications, variations and ledger already in the system. Snapshots are taken for you, and the report says what moved since the last one.

Book a demo
Construction AI·Larkspur House › CVR
Cost Value Reconciliation
Larkspur House · snapshot 31 Aug 2026
Construction AISnapshot now
Value
£3,861,840.00
contract sum by cost code
Total value
£0.00
revised + variations
Total cost
£0.00
cost + forecast to complete
Margin
£0.00 · 0.0%
value − total cost
CodeDescriptionTotal valueCost to dateTotal costOver/(under)
1000Preliminaries£490,440£412,900£478,500£11,940
2000Groundworks£639,150£583,420£607,400£31,750
3000Concrete frame£1,402,500£1,296,500£1,385,600£16,900
4000Drylining£433,000£396,240£424,600£8,400
5600Electrical£635,680£561,700£637,900(£2,220)
7000Roofing£358,900£341,280£352,100£6,800
Totals6 cost codes · vars £97,830£3,959,670£3,592,040£3,886,100£73,570
Value from the bid return, cost from the ledger, variations from the register. 5600 Electrical is over: Marlow’s application 2 carries an unpriced SI.

The tools

From the whole job down to the code that moved.

Construction AI·Larkspur House › CVR
Cost Value Reconciliation
Larkspur House · snapshot 31 Aug 2026
Construction AISnapshot now
Value
£3,861,840.00
contract sum by cost code
Total value
£0.00
revised + variations
Total cost
£0.00
cost + forecast to complete
Margin
£0.00 · 0.0%
value − total cost
CodeDescriptionTotal valueCost to dateTotal costOver/(under)
1000Preliminaries£490,440£412,900£478,500£11,940
2000Groundworks£639,150£583,420£607,400£31,750
3000Concrete frame£1,402,500£1,296,500£1,385,600£16,900
4000Drylining£433,000£396,240£424,600£8,400
5600Electrical£635,680£561,700£637,900(£2,220)
7000Roofing£358,900£341,280£352,100£6,800
Totals6 cost codes · vars £97,830£3,959,670£3,592,040£3,886,100£73,570
Value from the bid return, cost from the ledger, variations from the register. 5600 Electrical is over: Marlow’s application 2 carries an unpriced SI.
01

Value against cost, code by code

Value, transfers and variations on one side. Cost to date, client variations, what is unrecovered, provisions and cost to complete on the other. An over or under for each code.

  • Built from the records already there.
  • Nothing is keyed into a spreadsheet.
  • Variations that are not recovered are shown as that.
Construction AI·Larkspur House › CVR › 5600 Electrical
5600 Electrical
Larkspur House · CVR · snapshot 31 Aug
Construction AI1 alert
Total value
£635,680
value plus variations
Forecast cost
£637,900
to date plus to complete
Over or under
− £2,220
on this code
LineLikelyBest
Variations agreed£24,180£24,180
Variations not yet agreed£13,200£19,600
Unrecovered from the client− £6,400− £2,100
Provisions£8,000£4,000
Commercial alert
Cost on this code has moved the same way for three snapshots running.
Each code opens into its variations, its likely and best positions and its margin.
02

Open a code and see why

Each code opens into its variations, its likely and best positions, its margin and any commercial alerts.

  • Agreed and not-yet-agreed variations apart.
  • Likely and best positions side by side.
  • An alert when a code keeps drifting the same way.
Construction AI·Larkspur House › CVR › Budget transfers
Budget transfers
Larkspur House · each one posted as a balanced from and to
+ Transfer
DateFromToAmount
12 Aug1000 Preliminaries5600 Electrical£6,000
20 Aug7000 Roofing4000 Drylining£3,500
28 Aug3000 Concrete frame2000 Groundworks£9,000
Moved between codes£18,500 out, £18,500 in
A transfer always has a from and a to, so the total budget never moves by accident.
03

Budget moved between codes, on the record

A transfer is posted as a balanced from and to, so budget moves between codes without the total changing.

  • Every transfer has a date and both codes.
  • The revised value on each code follows.
  • They appear in the report for the window they were made in.
Construction AI·Larkspur House › CVR › Report
What moved since the last valuation?
Snapshot 31 Aug against 31 Jul · largest first
Construction AIWordExcel
Cost codeMovedIn the same window
5600 Electrical− £14,300Transfer in £6,000 · 2 costs posted · drifting three snapshots
2000 Groundworks− £6,900Transfer in £9,000 · 3 costs posted
4000 Drylining+ £4,100Variation CCI-007 agreed · transfer in £3,500
1000 Preliminaries− £2,200Transfer out £6,000 · 4 costs posted
It lists the transfers, variations and postings in the same window. It does not claim they were the cause.
04

“What moved since the last valuation?”

The CVR report answers it code by code, largest first, and lists the transfers, variations and postings made in the same window.

  • It does not claim those were the cause.
  • Codes drifting the same way three snapshots running are flagged.
  • It goes out to Word or Excel.

Questions

Where do the figures come from?
From the records already in the system: applications and certificates for value, the ledger and commitments for cost, the cost report for variations.
How often is a snapshot taken?
By itself every 72 hours unless you change it, whenever you ask for one, and whenever an application is certified.
Does the report tell me why the margin moved?
It tells you what moved, largest first, and lists what happened on that code in the same window. It does not claim those were the cause; that judgement is yours.
Can I move budget between cost codes?
Yes. A transfer is posted with a from and a to, so the total does not change and the move is on the record.

See your margin by cost code.

Tell us about a live job. We will show you its CVR and what moved on a demo call.