Win the work

Kept once. Used on every job.

Rates, prelims, scopes, matrices, payment terms and letters live in one library. Every estimate, enquiry and subcontract starts from it, so the company prices and writes the same way each time.

Book a demo
Construction AI·Library
Library
Company-wide · what every job starts from
Search the library
Schedule of Rates
6 books
Preliminaries
3 books
Staff and Resources
2 books
Pricing Schedules
24 schedules
Multi-Code Schedules
4 schedules
Scope of Works
31 scopes
Design Responsibility
18 matrices
Attendances
12 matrices
Payment Schedules
5 schedules
Document Templates
42 templates
Project Plans
7 templates
Inspection Templates
19 checklists
Make a copy
Master rates 2026 → London rates 2026, labour rates + 12%, materials unchanged.
Every list can be searched, grouped, filtered by year, copied and exported.

The tools

What the company prices and writes from.

Construction AI·Library
Library
Company-wide · what every job starts from
Search the library
Schedule of Rates
6 books
Preliminaries
3 books
Staff and Resources
2 books
Pricing Schedules
24 schedules
Multi-Code Schedules
4 schedules
Scope of Works
31 scopes
Design Responsibility
18 matrices
Attendances
12 matrices
Payment Schedules
5 schedules
Document Templates
42 templates
Project Plans
7 templates
Inspection Templates
19 checklists
Make a copy
Master rates 2026 → London rates 2026, labour rates + 12%, materials unchanged.
Every list can be searched, grouped, filtered by year, copied and exported.
01

One place for everything that is reused

Rate books, preliminaries, staff, pricing schedules, scopes, matrices, attendances, payment schedules, templates, project plans and inspection checklists.

  • Search, group and filter by year.
  • Make a copy with a percentage change to all rates, materials only or labour only.
  • Every list exports.
Construction AI·Library › Schedule of Rates › Master rates 2026
Master rates 2026
Library › Schedule of Rates › Mechanical · copper pipework
Construction AIExport
Nett
£1,686.42
cost before margin
Sell
£1,747.97
what tenders receive
Margin
£61.55
3.5%
DescriptionUnitMaterialLabourRate
Copper tube 15 mm, clipped to wallm£4.86£7.94£12.80
Copper tube 22 mm, clipped to wallm£8.12£9.02£17.14
Copper tube 28 mm, clipped to wallm£11.40£10.34£21.74
End-feed elbow, 22 mmnr£2.10£6.60£8.70
Isolation valve, 22 mmnr£14.80£9.90£24.70
Ask the rate co-pilot
“Copper up 2%.” Nine material figures changed, shown for you to check before they are saved.
Master, London-weighted and each year’s book sit side by side. A missing rate can be worked out from similar items.
02

Your rates, with the build-up behind each one

A rate can carry its material, labour and plant. The rate co-pilot makes bulk changes, works out a missing rate from similar items and finds rates that have gone stale.

  • Nett, sell and margin on every book.
  • Master, London-weighted and each year’s book side by side.
  • Build a schedule from text, a PDF, a photo or Excel.
Construction AI·Library › Preliminaries
Preliminaries
Library › Preliminaries › Fit-out, 26 weeks
Construction AIImport
ItemWeeksUseRateTotal
Site manager26100%£1,850£48,100
Site cabins and welfare26100%£310£8,060
Goods hoist14100%£620£8,680
Temporary electrics26100%£95£2,470
Waste and skips2250%£480£5,280
Total£72,590
Period, utilisation and rate. Ask for a prelims table in words; you confirm it, and the arithmetic is done by the system, not the AI.
03

Time-based books: period, utilisation and rate

Preliminaries and staff are priced by time. Ask for a prelims or staffing table in words, confirm it, and it is written into the book.

  • The arithmetic is done by the system, not the AI.
  • Weekday, Saturday and Sunday overtime premiums on the staff book.
  • Both import from and export to Excel.
Construction AI·Library › Scope of Works › 4000 Drylining
Scope of Works · 4000 Drylining
Larkspur House › Documents · v3 · from K10 rev P02 and the 23xx sheets
Staged · awaiting review
Scope of Works — Drylining, partitions and bulkheads
Northgate Contracts Ltd · P26001 Larkspur House · package 4000 · rev v3
1Extent of the works. Partitions PT1–PT4 and bulkheads to levels 1–3 per A-2301 and the 23xx sheets.
2Specification. NBS K10 rev P02 in full; clause 610 fire ratings apply to all F-suffix types.
3Fire-rated partitions. 60 minutes to corridors and stair enclosures, 30 minutes elsewhere; deflection heads to K10/310.
4Access panels and bulkheads. Access panels per K10/320; reception bulkhead to detail A-2104/07 (RFI #004).
5Interfaces. Ceilings package 4100 above; M&E 5500/5600 penetrations fire-stopped by this package.
6Attendances. Unloading, distribution and waste per the attendances schedule.
v3 staged by Claude for Sam Okafor · v2 stays current until you commitCommit v3Discard
04

A general scope, and one for every trade

The general scope sits on top of every trade package’s scope. Draft one from reference content, or import the scope you already use, word for word.

  • If a clause is not found exactly in your source, nothing is saved.
  • Clauses are edited in place, with notes.
  • Exports to Excel.
Construction AI·Library › Design Responsibility Matrix › 4000
Design Responsibility Matrix
Library › 4000 Drylining · who designs what
Construction AIExport
Design activityArchStrM&EFireMCSub
Partition types and performance1––2––
Deflection head details22–––1
Fire-stopping at penetrations––22–1
Ceiling setting-out1–2––2
Bulkhead framing and fixings22–––1
Access panel locations2–1––N/A
Built from a description of the trade, or from a matrix you already have, responsibilities included.
05

Who designs what, package by package

One row per design activity, set for each of six parties. Build it from a description of the trade, or from a matrix you already have.

  • Attendances work the same way: who provides each site facility.
  • Describe the trade and tick what to bring in.
  • Exports to Excel.
Construction AI·Library › Payment Schedules
Payment schedule
Library › Payment Schedules › Monthly, 28 days
Construction AI5 of 5 comply
RuleSet toRelies onCheck
Application date25th of each months.110OK
Payment due date7 days after applications.110(1)(a)OK
Payment notice5 days after the due dates.110AOK
Final date for payment21 days after the due dates.110(1)(b)OK
Pay less notice7 days before the final dates.111OK
Described in words
“Monthly, apply on the 25th, 28 days to pay.” The five rules were filled in from that, and each one checked.
Each rule shows the section of the Construction Act it relies on. The defaults come from the Scheme for Construction Contracts.
06

Payment terms, checked against the Construction Act

Describe the terms in words and five rules are filled in. Each one is checked against the Act and shows the section it relies on.

  • The rules generate the monthly payment cycle.
  • Defaults come from the Scheme for Construction Contracts.
  • The same schedule goes into the enquiry and the subcontract.
Construction AI·Library › Document Templates
Document templates
Library › Document Templates · 42 templates
Construction AI+ Template
TemplateUsed byVariables
Site instructionCorrespondence12, all filled
Early warning noticeCorrespondence9, all filled
Subcontract particulars, JCTProcurement31, all filled
Purchase orderProcurement14, all filled
Enquiry letterTender packages1 cannot be filled
Enquiry letter
{{site.parking}} is not something a tender package holds. Remove it, or type the text in.
Draft a template from a description, or from a photo or PDF of a letter you already use.
07

Letters and forms that fill themselves in

Site instructions, early warnings, enquiry and tender letters, subcontract particulars and orders, written once with variables.

  • The editor flags any variable it cannot fill.
  • Draft a template from a description, or from a photo or PDF of a letter you already use.
  • Subcontract particulars in JCT, NEC or your own form.

Works with the rest

Nothing on this page is typed a second time somewhere else.

Questions

Can I bring in the rates and scopes I already have?
Yes. Rate books import from Excel, and a scope can be imported from Word, Excel or a PDF word for word. If a clause is not found exactly in your source, nothing is saved.
Can I keep different rates for different regions or years?
Yes. Copy a book with a percentage change to all rates, materials only or labour only, and keep the variants side by side.
Are the payment terms legal?
Each rule in a payment schedule is checked against the Construction Act and shows the section it relies on. It is a check on the dates, not legal advice.
Does the AI change my rates?
Only when you ask and confirm. A bulk change is shown for you to check before it is saved.

Bring a rate book.

Send us a schedule of rates in Excel. We will load it and price a package from it on a demo call.