Run the job

Every drawing, RFI, diary and snag on the same job.

Design information, the programme, the site and the 3D model share one set of records, so the person who needs to know sees the problem while it is still cheap to fix.

Shown working

Two things that only work when the records are joined.

An unanswered RFI shows up as days, not as a number in a register.

Link the RFI to the activity it holds up and it gets a date it must be answered by.

Construction AI·Larkspur House › RFIs › RFI #004
RFI #004 Responded
Reception feature ceiling — confirm omission before bulkhead is framed
Construction AIReviseExport PDF
Is the reply satisfactory?Close RFICreate revision
Northgate Contracts Ltd
Unit 4, Riverside Works · Manchester
RFI #004
P26001 · Larkspur House · for Ardent Estates
Reception feature ceiling — confirm omission before bulkhead is framed
ToR. Menon (Laird Studio)
FromSam Okafor
Date raised19 Aug 2026
Due date26 Aug 2026
LocationLevel 1 reception, grid C/7
Cost code4000 · Drylining
Cost impactYes · CCI 003
Programme impactYes · on the critical path
DrawingsLH-LRD-ZZ-01-DR-A-2301 rev C
SpecificationK10/315 Bulkheads
Ball withSam Okafor
Copies toAlan Pryor, Ardent Estates
Question from Sam Okafor · 19 Aug 2026, 10:00

A-2301 rev C omits the feature ceiling at reception but the door schedule rev B still carries the ceiling-mounted closers. Please confirm the omission is instructed before we frame the bulkhead on Monday 24 August.

Reply from R. Menon, Laird Studio · 22 Aug 2026, 10:00

Confirmed — the feature ceiling is omitted under AI-023. Proceed with the plasterboard bulkhead to detail A-2104/07. The door schedule will be corrected at rev C.

What is in it

Twelve sets of tools, from the drawing register to the phone on the scaffold.

01See the screens

Drawings and mark-up

Title blocks read, revisions superseded, measured and marked up on one screen.

  • Register
  • Mark-up
  • Compare revisions
  • QR packs
02See the screens

Specifications, RFIs and submittals

Clauses you can ask questions of, and RFIs that know what they hold up.

  • Specification reader
  • RFIs
  • Need-by dates
  • Submittals
03See the screens

Correspondence and instructions

Letters and instructions that reach the cost report by themselves.

  • Letters
  • Site instructions
  • Change requests
04See the screens

Document Control

One register for every firm on the project, designed around ISO 19650.

  • Register
  • Reviews
  • Stamps
  • Deliverables
05See the screens

3D models

Open the IFC in the browser. Mark what is installed.

  • Viewer
  • Quantities
  • Progress
  • Claim links
06See the screens

Programme

Your P6, Asta or MS Project file on a real scheduling engine.

  • Import and export
  • Critical path
  • Baselines
  • Line of balance
07See the screens

Site diary and photos

Say it on site. It is written up before you are back in the cabin.

  • Diary
  • Walk and talk
  • Photos and video
08See the screens

Snags

One walk-round. Every trade gets only its own list.

  • Snag walk
  • Subcontractor loop
  • Handover report
09See the screens

Inspections, test plans and non-conformance

A signed inspection closes its line on the test plan.

  • Inspections
  • Test plans
  • Non-conformance reports
10See the screens

RAMS and health and safety

Describe the work. The RAMS is drafted, and the gang signs the approved revision.

  • RAMS
  • COSHH register
  • Briefings
  • Sign-on
11See the screens

Deliveries

Booked in at the lorry, against the order.

  • Book-in
  • Docket check
  • Shortages
12See the screens

The field app

The site tools on a phone, working with no signal.

  • Offline outbox
  • Drawings on the phone
  • Timecards

The field app installs from the browser on a phone or tablet. It is not in the app stores.

Put one live job on it.

Tell us about the job. We will show you its drawings, RFIs and site records working together on a demo call.