Win the work

Price it once. Level what comes back. Sign the bid.

Build the bill, send the packages to your supply chain, compare every bid on the same lines and compile your tender, in one chain with nothing typed twice.

Shown working

From the levelled bids to the signed subcontract.

The price you bought at is the price you pay against.

From the levelled bids to the signed subcontract to the application, the figures are carried, not copied.

Construction AI·Tender package 4000 › Bid comparison
4000 — Drylining
Larkspur House · Tender package · Bid comparison · returns 3 of 4
Tender AnalysisConstruction AI
InviteesCompareAnalysis
ItemDescriptionHalliwell DryliningApex InteriorsNorton & Bell
4000.1Metal stud partitions, levels 1–3£182,400£176,900£214,200
4000.2MF ceilings and bulkheads£96,300£101,800£94,750
4000.3Fire-stopping to compartment lines£24,100excluded£26,800
4000.4Acoustic upgrades, meeting rooms£31,500£29,950£30,400
4000.5Attendances and preliminaries£18,000£22,500£17,250
Return total£352,300£331,150£383,400
In lineQuery raisedOutlier
3 queries raisedFinal analysis£0.00
Tender queries · drafted from the comparisonSend to bidders
4000.1Norton & BellPartitions 17% above the other returns: confirm the specification allowed for (BS EN 520 board, 70 mm stud).Outlier
4000.3Apex InteriorsFire-stopping excluded: price the compartment lines on drawing 03001 or confirm the exclusion stands.Outlier
4000.5Apex InteriorsAttendances 25% above the others: confirm what the sum covers beyond the preliminaries listed.Query

Bring your next tender.

Tell us what you are pricing. We will show you the bill, the packages and the levelling on a demo call.