Win the work

Build the bill once. Price it from your own rates.

Start from a description or the client’s bill of quantities. Each item is matched to your rate book, each package goes out to tender or is priced in-house, and the estimate becomes the bid without being typed again.

Book a demo
Construction AI·Library › Pricing Schedules › 3100
Library › Pricing Schedules › 3100
3100 — Roofing — warm deck
Construction AIPush to TenderPush to Master
Schedule
Cost code 3100 RoofingLabour £44.00 /hrMarkup 12%
Nett
£0.00
cost before markup
Sell
£0.00
priced items only
Margin
£0.00
15.6% margin
ItemDescriptionQtyUnitUtil %RateTotal
1Preparation(3)£3,264
3100-001Strip existing felt and insulation, cart away210m²1009.82£2,062.20
3100-002Inspect and repair deck — provisional1prov100850.00£850.00
3100-003Set out falls and outlet positions1item100352.00£352.00
2Roof build-up(3)£15,756
3100-004Vapour control layer, lapped and sealed210m²1006.21£1,304.10
3100-005120 mm PIR insulation, mechanically fixed210m²10031.70£6,657.00
3100-006Single-ply membrane, welded seams210m²10037.12£7,795.20

The tools

From the client’s bill to the figure you will bid.

Construction AI·Larkspur House › Pricing › 4000 › Schedule Builder
Schedule Builder
4000 Drylining · from ‘Larkspur House BoQ.xlsx’
Construction AIAdd to package
Sections
8
as the client set them
Items
80
read from the bill
Quantities kept
80 of 80
none retyped
RefDescriptionQtyUnit
4000.1.01Metal stud partition, two layers 12.5 mm board1,240m²
4000.1.02Deflection head to underside of slab310m
4000.2.01MF ceiling, plasterboard, taped and filled860m²
4000.2.02Bulkhead, 600 girth142m
4000.3.01Fire-stopping to compartment lines1item
Drafted from a description, or from the client’s bill as Excel, a PDF or a photo. The client’s quantities are kept.
01

The bill, drafted from a description or the client’s own

Describe the work and the whole bill structure is drafted. Or upload the client’s bill as Excel, a PDF or a photo, and it is read in with its quantities kept.

  • Sections and sub-sections as the client set them.
  • Their quantities are kept, not retyped.
  • It can start from a schedule in your library.
Construction AI·Library › Pricing Schedules › 3100
Library › Pricing Schedules › 3100
3100 — Roofing — warm deck
Construction AIPush to TenderPush to Master
Schedule
Cost code 3100 RoofingLabour £44.00 /hrMarkup 12%
Nett
£0.00
cost before markup
Sell
£0.00
priced items only
Margin
£0.00
15.6% margin
ItemDescriptionQtyUnitUtil %RateTotal
1Preparation(3)£3,264
3100-001Strip existing felt and insulation, cart away210m²1009.82£2,062.20
3100-002Inspect and repair deck — provisional1prov100850.00£850.00
3100-003Set out falls and outlet positions1item100352.00£352.00
2Roof build-up(3)£15,756
3100-004Vapour control layer, lapped and sealed210m²1006.21£1,304.10
3100-005120 mm PIR insulation, mechanically fixed210m²10031.70£6,657.00
3100-006Single-ply membrane, welded seams210m²10037.12£7,795.20
02

A grid that works the way a spreadsheet does

It saves as you type, Enter moves down a row, and a toggle shows the material, labour, plant and subcontract content behind every rate.

  • Pricing schedules by cost code, or one schedule across many codes.
  • Staff and management, preliminaries, and overheads and profit each have their own package.
  • Every package can start from a library book.
Construction AI·Larkspur House › Pricing › 4000 › Match Rates
Match Rates
4000 Drylining · matched to Master rates 2026 by meaning
71 of 80 matchedApply ticked
Item in the billMatched toSureRate
✓Metal stud partition, two layersPartition, 70 stud, 2 × 12.596%£58.40
✓Deflection head to slabDeflection head, 50 mm91%£14.20
✓MF ceiling, taped and filledMF ceiling, one layer 12.594%£46.10
Bulkhead, 600 girthBulkhead, 450 girth62%£61.00
Fire-stopping to compartment linesNo match in the book——
Every match carries how sure it is. You tick which to apply; the rest stay unpriced for you.
03

Every item matched to your rate book, for you to tick

Each line of the bill is matched to your rates by what it means, not by its wording, with a figure for how sure the match is.

  • You tick which matches to apply.
  • A weak match is shown as weak.
  • An item with no rate is left unpriced, not guessed.
Construction AI·Larkspur House › Pricing
Pricing
Larkspur House · each package takes one of three routes
PricingMasterAdjudication
CodePackageNettRoute
STAFFStaff and management£298,413Priced in-house
PRELIMPreliminaries£35,850Priced in-house
4000Drylining£83,640Pushed to tender
4100Suspended ceilings£235,578Split · 2 packages
4600Floor finishes£94,850Pushed to tender
6000Mechanical£243,027Pushed to tender
Out to tender as it stands, split so each cost code becomes its own subcontract package, or priced in-house with margin applied.
04

Each package goes out to tender, is split, or is priced in-house

Push a package to tender as it stands. Split it so every cost-code section becomes its own subcontract package. Or push it to Master and price it yourself, with margin applied per package or in bulk.

  • Packages arrive in tendering already built, not typed in again.
  • The winning subcontract price comes back into the estimate.
  • Margin and uplift are set per package.
Construction AI·Larkspur House › Pricing › Adjudication
Pricing
P26001 — Larkspur House
Construction AI
Schedule BuilderMaster PricingAdjudication
Package adjustments
Adjust individual packages or expand to see line items
PackageMasterAdjust %AdjudicatedMargin %Sell
Staff & management£298,4130£298,4130£298,413
Prelims£35,8500£35,8500£35,850
4000 Drylining£83,640-2.5£81,54910£89,704
4100 Suspended ceilings£235,578-2.5£229,68910£252,657
4600 Floor finishes£94,850-2.5£92,47910£101,727
6000 Mechanical£243,027-2.5£236,95110£260,646
Master £991,358 · adjudicated with 2.5% off the subcontract packages · 10% marginSell£0.00
05

The commercial review before the bid goes in

Adjust the whole bid or one package, by a percentage or a sum, keep the minutes of the meeting beside the figures, then submit.

  • Every adjustment is shown against the figure it changed.
  • Submit locks the bid; Unlock reopens it.
  • The sell total is the number that goes in your tender.

Questions

Can I start from the client’s bill of quantities?
Yes. Upload it as Excel, a PDF or a photo. The structure is read in and the client’s quantities are kept.
Does it price the job for me?
No. It matches each item to your own rate book and shows how sure each match is. You tick which to apply, and anything without a rate is left for you.
Can smaller jobs be priced in one schedule?
Yes. A multi-code schedule covers a whole job in one book, across as many cost codes as it needs.
What happens when a subcontractor wins a package?
Their price is pushed back into Master Pricing, so the estimate carries the figure you actually bought at.

Bring your next tender.

Tell us what you are pricing. We will build the bill and match it to a rate book on a demo call.