A signed inspection closes its line on the test plan.

Checklists for health and safety, quality and every test on the job. A passed, signed inspection closes its line on the plan. A failed item becomes a snag, and a non-conformance runs through to closure.

Book a demo
Construction AI·Larkspur House › Inspections › Scaffold
Scaffold inspection · East, week 34
Larkspur House · template Scaffold (SG4) · Tom Halloran · Cornfield attending
Construction AIExport PDFSubmit
Dictated “East elevation scaffold, week thirty-four. Base plates fine, ties fine, toe board missing on bay six lift three, tell Cornfield, ladders fine, tag signed, loading fine…”
Checklist itemPass · Fail · N/A
Base plates and sole boardsN/A
Ties at 4 m centres, no missing tiesN/A
Guard rails and toe boards on every liftN/A
Toe board missing, bay 6 lift 3 — snag 013-04 raised to Cornfield
Ladders secured and extended 1 m above the platformN/A
Scaff tag current and signedN/A
Loading within the class statedN/A
Debris nettingN/A
5 pass · 1 fail · 1 n/a · attendees recorded · photos 2Complete with 1 action

The tools

From the checklist to the closed line on the plan.

Construction AI·Larkspur House › Inspections › Scaffold
Scaffold inspection · East, week 34
Larkspur House · template Scaffold (SG4) · Tom Halloran · Cornfield attending
Construction AIExport PDFSubmit
Dictated “East elevation scaffold, week thirty-four. Base plates fine, ties fine, toe board missing on bay six lift three, tell Cornfield, ladders fine, tag signed, loading fine…”
Checklist itemPass · Fail · N/A
Base plates and sole boardsN/A
Ties at 4 m centres, no missing tiesN/A
Guard rails and toe boards on every liftN/A
Toe board missing, bay 6 lift 3 — snag 013-04 raised to Cornfield
Ladders secured and extended 1 m above the platformN/A
Scaff tag current and signedN/A
Loading within the class statedN/A
Debris nettingN/A
5 pass · 1 fail · 1 n/a · attendees recorded · photos 2Complete with 1 action
01

The checklist on your phone, walked through by voice

Built-in checklists and your own templates. Each inspection has attendees, pass and fail items with notes and photos, signatures, and a PDF you can email.

  • Weekly health and safety, quality and environmental.
  • Scaffolding, excavation, lifting, temporary works, fire and plant.
  • Witness, pressure test, flushing and commissioning.
Construction AI·Larkspur House › Inspection and test plan
Inspection and test plan
Larkspur House · mechanical and electrical
Construction AI1 failed
CheckPointState
Containment installed and bondedHoldClosed by INS-031
Pressure test, LTHW level 2WitnessClosed by INS-034
Flushing and water treatmentWitnessINS-036 failed, 2 items
Fire-stopping at risersReviewBooked 22 Sep
AHU-01 commissioningHoldNot started
A passed, signed inspection closes its line on the plan by itself. Hold, witness and review points are tied to the specification clause.
02

The plan closes itself as inspections pass

The inspection and test plan lists the hold, witness and review points. A passed, signed inspection closes its line.

  • Each point is tied to an inspection template and a specification clause.
  • What is open, booked or failed is plain.
  • An inspection can be started from elements selected in the 3D model.
Construction AI·Larkspur House › Inspections › INS-036
INS-036 · Flushing 2 failed
LTHW level 2 · Marlow Mechanical · witnessed 17 Sep
Re-inspect failed items
ItemResultThen
Strainers cleaned and refittedPass—
Flow rate recorded at each terminalFailSnag 014-02 raised
Water sample taken and labelledFailSnag 014-03 raised
System vented at high pointsPass—
Chemical dosing recordedPass—
Failed items
Both became snags in one go, each carrying its photo as the before evidence.
Once they are fixed, you inspect again only the items that failed.
03

A failed item becomes a snag. Then only it is inspected again.

Failed items become snags in one go, each carrying its photo as the before evidence. Once they are fixed, you re-inspect just the items that failed.

  • Nobody copies a failure into another list.
  • The trade gets it with its other snags.
  • Fixed items are checked again on their own.
Construction AI·Larkspur House › Non-conformance › NCR-006
NCR-006
Fire-stopping omitted at riser 2, level 2 · Marlow Mechanical
Construction AIPDF
OpenIssuedRespondedActionedClosed
Their response, through the portal
Root cause. Penetrations were made after the fire-stopper’s visit.
Corrective action. Fire-stop 14 penetrations by 26 Sep.
Preventive action. None given.
NCR coach
Not yet acceptable
No preventive action is given, and the corrective action does not say who checks it. Questions drafted:
Who signs off penetrations before a riser is closed up?
Which drawing shows the 14 penetrations?
The coach gives a view and drafts the follow-up. A person accepts or rejects the response.
04

From the report to the root cause, to closed

A non-conformance report is issued to the subcontractor, who responds through their portal with root cause, corrective action and preventive action.

  • The coach tidies the wording and lists what a reviewer will want.
  • It assesses the response and drafts the follow-up questions.
  • A person accepts or rejects it.

Questions

Can I use my own checklists?
Yes. There are built-in checklists, and you can save your own templates. A paper checklist can be photographed and turned into a template.
How does an inspection close the test plan?
Each line on the plan is tied to an inspection template. When that inspection is passed and signed, its line closes by itself.
What happens when something fails?
The failed items become snags in one go, with their photos as the before evidence. Once fixed, you inspect again only those items.
Does the subcontractor answer a non-conformance in the system?
Yes, through their portal, with root cause, corrective action and preventive action.

Run next week’s inspections on it.

Tell us which checks you carry out. We will show you one close its line on the plan on a demo call.