Ask the specification. Know what each RFI is holding up.
Specifications are read into sections you can search and question. An RFI knows the drawings, the clauses and the programme activity it blocks. A submittal follows the review steps you set.
Reception feature ceiling — confirm omission before bulkhead is framed
Construction AIReviseExport PDF
Is the reply satisfactory?Close RFICreate revision
Northgate Contracts Ltd
Unit 4, Riverside Works · Manchester
RFI #004
P26001 · Larkspur House · for Ardent Estates
Reception feature ceiling — confirm omission before bulkhead is framed
ToR. Menon (Laird Studio)
FromSam Okafor
Date raised19 Aug 2026
Due date26 Aug 2026
LocationLevel 1 reception, grid C/7
Cost code4000 · Drylining
Cost impactYes · CCI 003
Programme impactYes · on the critical path
DrawingsLH-LRD-ZZ-01-DR-A-2301 rev C
SpecificationK10/315 Bulkheads
Ball withSam Okafor
Copies toAlan Pryor, Ardent Estates
Question from Sam Okafor · 19 Aug 2026, 10:00
A-2301 rev C omits the feature ceiling at reception but the door schedule rev B still carries the ceiling-mounted closers. Please confirm the omission is instructed before we frame the bulkhead on Monday 24 August.
Reply from R. Menon, Laird Studio · 22 Aug 2026, 10:00
Confirmed — the feature ceiling is omitted under AI-023. Proceed with the plasterboard bulkhead to detail A-2104/07. The door schedule will be corrected at rev C.
The tools
From the clause to the answer, to the approved submittal.
Run the job
Construction AI·Larkspur House › Specifications › K10
Specification · Rev P02 · 40 pages · From Laird Studio · 8 sections
Construction AI
DownloadOpen in new tabConnectThumbnailsSections
Plasterboard dry linings
NBS K10 — particular specification · Larkspur House · Rev P02 · Laird Studio
Search by meaning
“what fire rating do the corridor partitions need?”
610 Fire-rated systems, p.8 — 60 minutes to corridors and stair enclosures; 30 minutes elsewhere. Cross-ref 310 Partitions, p.4.
Sections · 8 main
110Intentp.1
210Plasterboardp.2
215Fixings and adhesivesp.3
310Partitionsp.4
315Bulkheads and ceiling marginsp.5
320Access panelsp.6
420Jointing and finishingp.7
610Fire-rated systemsp.8
Linked records · RFI #004 · LH-LRD-ZZ-01-DR-A-2301
01
The specification, read into its sections
Upload a specification of any length. It is split into sections, which you check beside the PDF and publish.
NBS-style specifications are handled.
RFIs, submittals and letters can cite a clause.
Every clause is searchable by meaning.
Construction AI·Larkspur House › Ask
Project knowledge
Larkspur House · 14 specifications · 473 drawings · 48 communications · searchable by meaning
Query fire rating of the corridor partitions, and the sheets that show them
NBS K10 · 610 Fire-rated systems · p.80.91
Partitions to corridors and stair enclosures: 60 minutes integrity and insulation to BS EN 1364-1. Elsewhere 30 minutes unless noted on the drawings.
NBS K10 · 310 Partitions · p.40.84
Partition types PT1–PT4 as scheduled on LH-LRD-ZZ-01-DR-A-2301. Fire-rated types carry the suffix F.
LH-LRD-ZZ-01-DR-A-2301 rev C · notes0.78
Corridor partitions PT2F to underside of slab. Deflection head per K10/310. See RFI #004 for the reception bulkhead.
Answer
60 minutes to corridors and stair enclosures, 30 minutes elsewhere K10/610 p.8. The corridor type is PT2F, to the underside of the slab A-2301 rev C. The sheets: A-2301 and the three 23xx partition sheets. The reception bulkhead is a separate question, answered on RFI #004.
02
A question answered from the clause
Ask what the specification requires and the answer comes from the clause text, with the clause it came from.
The answer cites its sources.
It draws on the drawings and the RFIs as well.
It says when the documents do not answer the question.
Construction AI·Larkspur House › RFIs › RFI #004
RFI #004 Responded
Reception feature ceiling — confirm omission before bulkhead is framed
Construction AIReviseExport PDF
Is the reply satisfactory?Close RFICreate revision
Northgate Contracts Ltd
Unit 4, Riverside Works · Manchester
RFI #004
P26001 · Larkspur House · for Ardent Estates
Reception feature ceiling — confirm omission before bulkhead is framed
ToR. Menon (Laird Studio)
FromSam Okafor
Date raised19 Aug 2026
Due date26 Aug 2026
LocationLevel 1 reception, grid C/7
Cost code4000 · Drylining
Cost impactYes · CCI 003
Programme impactYes · on the critical path
DrawingsLH-LRD-ZZ-01-DR-A-2301 rev C
SpecificationK10/315 Bulkheads
Ball withSam Okafor
Copies toAlan Pryor, Ardent Estates
Question from Sam Okafor · 19 Aug 2026, 10:00
A-2301 rev C omits the feature ceiling at reception but the door schedule rev B still carries the ceiling-mounted closers. Please confirm the omission is instructed before we frame the bulkhead on Monday 24 August.
Reply from R. Menon, Laird Studio · 22 Aug 2026, 10:00
Confirmed — the feature ceiling is omitted under AI-023. Proceed with the plasterboard bulkhead to detail A-2104/07. The door schedule will be corrected at rev C.
03
The RFI, with everything it refers to
Numbered when issued, with a distribution list, attachments, linked drawings and specification clauses, and threaded responses. External parties can reply.
The question can be drafted from photos or PDFs.
Each prints as a letter-headed PDF.
Revision history is kept.
Construction AI·Larkspur House › RFIs › RFI #004 › Programme
RFI #004 Need by 15 Sep · 6 days left
Fire rating to corridor partitions, level 2 · ball with Laird Studio
SUB-018Ironmongery schedule — final · Norton & BellP21/110Draft18 Sep
SUB-016 · AHU-01 and AHU-02 — selection and O&M
Revise and resubmit
Rev A · from Marlow Mechanical, 26 Aug · reviewed by R. Menon, Laird Studio, 2 Sep · spec T60/320 · programme: plant deck AHU set-down 21 Sep
Reviewer’s comment. Selection shows 4.2 m³/s against the 4.8 m³/s in T60/320 clause 3.4. Resubmit with the fan curve at the design duty and the acoustic data for the roof-level attenuators.
Rev B due 11 Sep · 10 days before set-down Programme riskExport PDF
05
Every submittal against its clause
A register of what has been submitted, against which clause, by whom, and where each one stands.
Approved, approved as noted or rejected.
Revise and resubmit, void and close.
Descriptions can be drafted from the uploaded documents.
Construction AI·Larkspur House › Submittals › SUB-016
SUB-016 Revise and resubmit
AHU-01 and AHU-02, selection and O&M · Marlow Mechanical
“AHU-02 static pressure is below the schedule. Reselect.” Brook Mercer Engineers. Answered by Marlow Mechanical; still open.
You design the steps. Each has an approver and a due date, and comments are answered and resolved on the document.
06
Review steps you design
Each submittal follows a workflow you set, with an approver and a due date for each step. Reviewers comment on the document, and comments are answered and resolved.
Distribution lists, clause references and linked drawings.
A PDF of the outcome.
The register exports.
Works with the rest
Nothing on this page is typed a second time somewhere else.