The instruction arrives. The variation is already in the account.

A client instruction becomes a variation in the cost report, a site instruction to the trade and a line in the next application, without anyone logging it twice.

Book a demo
Construction AI·Larkspur House › Cost Report
Cost Report
Larkspur House · rolling final account · 6 variations
Construction AIExport
Contract sum
£3,861,840
from the bid return
Client instructions
£61,430
3 CCIs
Requests for change
£36,400
3 RFCs, not yet instructed
Projected final account
£3,959,670
contract sum + variations
Account maturityAgreed £27,150Firm £34,280Budget £36,400
RefVariationYoursClient’sGapState
CCI-004Additional drainage run to plot boundary · 2000£27,150£27,150—Agreed
CCI-007Reception bulkhead and feature ceiling · 4000£11,200£8,450(£2,750)Firm
CCI-009Upgraded containment to plant deck · 5600£23,080——Firm
RFC-003Change of floor finish, levels 1–2 · 3000£17,900——Budget
RFC-005Additional small power, level 3 · 5600£14,300——Budget
RFC-006Temporary weathering, east elevation · 1000£4,200——Budget

The tools

The cost report above. Where each variation comes from and goes to, below.

Construction AI·Larkspur House › Correspondence › CCI-007
CCI-007 Confirmation of client instruction
Larkspur House › Correspondence · to the employer’s agent · reply due 16 Sep
Construction AIIssue
Northgate Contracts · letter
Reception bulkhead and feature ceiling

We confirm your instruction at the site meeting of 2 September to form a bulkhead and feature ceiling raft to reception, as marked on drawing A-2301 rev C.

This is a change to the Employer’s Requirements. We will price it and notify any effect on the completion date.

Cost code 4000Distribution: 4
What issuing this does
Variation CCI-007 added to the cost report
cost code 4000 Drylining · state Budget until priced
Site instruction SI-019 issued to Halliwell Drylining
on the subcontract variation register
Request for price RFP-011 sent with it
their build-up comes back against your assessment
Linked to what it relies on
drawing LH-LRD-ZZ-01-DR-A-2301 rev C · RFI #004
Void the letter and you are shown what comes off the cost report before it does.
01

A letter that reaches the cost report by itself

Confirm a client instruction or raise a request for change in correspondence. Issuing it creates the variation, sends the site instruction to the trade and links the drawings it relies on.

  • Instructions, requests for change, requests for price and confirmations, each with its own numbering.
  • A request for change converts to an instruction when the client agrees it.
  • Void a letter and you are shown what it will take off the cost report first.
Construction AI·Larkspur House › Cost Report › CCI-007
CCI-007 · build-up
Reception bulkhead and feature ceiling · your pricing against the client’s assessment
Construction AIExcel
Your build-upQtyYoursBasisClient’sGap
Bulkhead framing18 m£1,728Firm£1,728—
Plasterboard and skim42 m²£1,617Firm£1,617—
Feature ceiling raft1 item£5,900Firm£4,150(£1,750)
Access tower, one week1 wk£420Budget£0(£420)
Electrical alterations3 no.£555Budget£555—
Prelims, overheads, profit9.6%£980Firm£400(£580)
Total£11,200£8,450(£2,750)
Drafted from the instruction. A figure from a quote or your rate book is Firm. A figure the assistant worked out is Budget, and says so. Not priced: making good to the floor finish, which the instruction does not describe.
02

Your price on the left. The client’s assessment on the right.

Each variation has a two-sided build-up. The assistant drafts yours from the instruction, using your rate books and any quotes, and marks every figure by how sure it is.

  • A figure from a quote or your rate book is Firm. A figure it worked out is Budget.
  • What it cannot price is listed, not guessed.
  • Build-ups go out to Excel and come back in.
Construction AI·Larkspur House › Cost Report
Cost Report
Larkspur House · rolling final account · 6 variations
Construction AIExport
Contract sum
£3,861,840
from the bid return
Client instructions
£61,430
3 CCIs
Requests for change
£36,400
3 RFCs, not yet instructed
Projected final account
£3,959,670
contract sum + variations
Account maturityAgreed £27,150Firm £34,280Budget £36,400
RefVariationYoursClient’sGapState
CCI-004Additional drainage run to plot boundary · 2000£27,150£27,150—Agreed
CCI-007Reception bulkhead and feature ceiling · 4000£11,200£8,450(£2,750)Firm
CCI-009Upgraded containment to plant deck · 5600£23,080——Firm
RFC-003Change of floor finish, levels 1–2 · 3000£17,900——Budget
RFC-005Additional small power, level 3 · 5600£14,300——Budget
RFC-006Temporary weathering, east elevation · 1000£4,200——Budget
03

A final account that is kept, not assembled at the end

Contract sum, instructions, requests and the projected final account read across the top. Below, every variation with your price, the client’s assessment and the gap.

  • Account maturity shows how much of it is agreed, firm or still a budget.
  • Exposure by cost code, so you see which package is carrying the risk.
  • Rates looked up from your own rate books.
Construction AI·Larkspur House › Subcontract variations › 4000 Drylining
Subcontract variations
4000 Drylining · Halliwell Drylining · site instructions, requests for price and their own
Construction AI+ Site instruction
RefVariationTheirsYoursState
SI-019Reception bulkhead · CCI-007£9,245£9,245Agreed
SI-021Acoustic upgrade · CCI-011£4,860£4,120Assessed
RFP-011Fire-stopping, riser 2 · asked 4 Sep—Awaiting price
DOM-03Extra bulkhead · theirs£3,900Not evidenced
DOM-04Out-of-sequence work · theirs£2,150Query sent
DOM-03 · why your figure is blank
No site instruction, drawing revision or diary entry on record for a second bulkhead. Left blank with the reason, not set to zero. A query has gone to Halliwell from this line.
Subcontractors raise their own variations in the portal. The assistant proposes your assessment line by line and never alters their claim.
04

The same variation, on the subcontractor’s side

Site instructions and requests for price go to the trade. Subcontractors raise their own in the portal. Their build-up sits beside your assessment, grouped by package.

  • The assistant proposes your assessed quantity and rate. It never changes their claim.
  • A line with no evidence is left blank with the reason, not set to zero.
  • Ask which lines are not evidenced, and it tells you.
Construction AI·Larkspur House › Applications › Application 4
Application 4 · Main contract
Larkspur House · valuation to 31 August · assessed by the client's QS
Construction AI
Applied
£874,316.00
this application
Certified
£0.00
awaiting assessment
Retention 3%
£0.00
held to practical completion
Net due
£0.00
final date 27 September
CodePackageContractAppliedCertified
PRELIMPreliminaries£298,412£149,206£149,206
3900General builderswork£34,320£22,300£22,300
4000Drylining£352,300£176,150£168,400
4100Suspended ceilings£252,657£63,160£63,160
5500Mechanical services£1,150,000£287,500£275,000
5600Electrical services£880,000£176,000£176,000
Assessed against the contract sum · 2 lines certified below the application, with the reasons recorded
05

Agreed today, applied for this month

An agreed variation is pulled into the next application to the client, at the figure in the cost report.

  • No list of variations kept beside the valuation.
  • Variations are pulled in from the cost report, not retyped.
  • What the subcontractor is due for it arrives in their application the same way.
Construction AI·Larkspur House › CVR
Cost Value Reconciliation
Larkspur House · snapshot 31 Aug 2026
Construction AISnapshot now
Value
£3,861,840.00
contract sum by cost code
Total value
£0.00
revised + variations
Total cost
£0.00
cost + forecast to complete
Margin
£0.00 · 0.0%
value − total cost
CodeDescriptionTotal valueCost to dateTotal costOver/(under)
1000Preliminaries£490,440£412,900£478,500£11,940
2000Groundworks£639,150£583,420£607,400£31,750
3000Concrete frame£1,402,500£1,296,500£1,385,600£16,900
4000Drylining£433,000£396,240£424,600£8,400
5600Electrical£635,680£561,700£637,900(£2,220)
7000Roofing£358,900£341,280£352,100£6,800
Totals6 cost codes · vars £97,830£3,959,670£3,592,040£3,886,100£73,570
Value from the bid return, cost from the ledger, variations from the register. 5600 Electrical is over: Marlow’s application 2 carries an unpriced SI.
06

Value and cost move together, by cost code

The client’s side of a variation adds to value. The subcontractor’s side adds to cost. Both land on the cost code the instruction named.

  • Variations that are not recovered are shown as that, not buried.
  • The CVR report says what moved since the last valuation, largest first.
  • Snapshots are taken on certification and on a schedule you set.

Works with the rest

Nothing on this page is typed a second time somewhere else.

Questions

How does a variation get onto the cost report?
By issuing the instruction or request for change in correspondence. The variation is created from it, on the cost code the letter names.
Can a subcontractor raise their own variation?
Yes, in their portal. It appears on your subcontract variation register and in their next application, flagged until you have assessed it.
Does the assistant set my prices?
No. It drafts the build-up for you to check and marks which figures came from a quote or your rate book and which it worked out. Anything it cannot price is listed for you.
Does it work under JCT and NEC?
Yes. The main contract is read whichever form it is on: JCT, NEC4, FIDIC or bespoke.